current position: Electric elevator price manufacturer>News>Vitti sur SeineElectric brick elevator on construction siteQuality inspection

Vitti sur SeineElectric brick elevator on construction siteQuality inspection

Article author:Vitti sur Seine issuing time:2024/04/24 09:38:05 Reading:65

Meet the needs of choreographers and choreographers. In different plays according to the requirements of choreographers and choreographers, different height changes of the lifting platform can be used to change the shape of the stage, adapt to the requirements of the plot for the scenery or venue, and save the manpower and material resources consumed in setting the scene. Use the tilt device of the lift table to form a tilt table, and better highlight the effect in various performances. According to the needs of the plot, create special atmosphere and effect. Even simple stage machinery often participates in the performance activities from the date of its emergence. According to the needs of the plot,Electric elevator price manufacturer create some unexpected atmosphere and effect. For example,KiswaldaElectric basket elevatorWhy is it so popular the low-speed descent of the lift table is used to represent the sunken ship in the sea, and the valve on the lift table and the sudden disappearance and appearance of actors on the lift table are used to represent the people.

2Setting requirements: After the installation and commissioning of the construction electric elevator is completed, and the installation unit passes the self-inspection, it shall be supervised and inspected by the inspection and detection organization with corresponding qualifications; After the construction electric hoist passes the inspection, installation unit and supervision unit to conduct acceptance. In case of general construction contracting, the general construction contractor shall organize the acceptance. The acceptance form shall be signed by the relevant responsible person.

gVitti sur SeineIf the pressure of overflow valve is low, readjust the overflow valve. Under % rated load, adjust the oil level to be too low, fill the hydraulic oil with suction oil,Electric elevator price manufacturer filter the blockage, clean the oil suction section of the filter, and check the oil suction pipe and joint; Tighten the connector. Replace the connector if necessary.

The floor contact device shall be widely used on the construction site. The ground protective fence door shall be installed with interlocking protection device, which is sensitive and reliable.

BBabahoyoDouble-layer reinforcement mesh: reinforcement diameter mm, spacing mm.

NjThe bearing capacity of the ground under the concrete foundation plate shall be greater than .Mpa.

The floor contact device shall be widely used on the construction site. The ground protective fence door shall be installed with interlocking protection device, which is sensitive and reliable.


Vitti



Buffer. In order to increase the energy for the car to hit the top or sink to the bottom. Remove the rubber or sponge at the contact between the buffer and the car to increase its impact energy; Slipping of rope groove and other causes sudden fall of lift car accident safety tongs. In order to prevent the wire rope from breaking due to lifting. The safety tongs that can cut off the power supply and stop the car from falling should be removed from the car. The car without safety tongs shall not be taken or carried. If it is a simple electric elevator, there should be a safety device (safety stop pin, etc.) to prevent the car from suddenly falling when people load and unload goods in the car; All electric elevators with passengers or passengers on more than three floors (including three floors).

oIt is forbidden to use the travel limit switch as the stop switch.

PDuring the use period, the user unit shall organize professional technicians to inspect the construction electric hoist according to the specification requirements every month and record the inspection results.

IConvenient and efficientThe pulley shall meet the following requirements: the rope groove shall be curved, and the groove bottom radius R shall meet: r≤ R≤ r,Electric elevator price manufacturer where t is the radius of wire rope; The depth shall not be less than times the diameter of wire rope; The pulley guiding the wire rope upward shall prevent foreign matters from entering; Effective measures shall be taken to prevent wire rope from falling out of groove; The included angle between the wire rope and the plane normal of the pulley shaft (wire rope deflection angle) shall not exceed °.

fOSetting requirements: The installation and dismantling unit of construction electric lift shall have the professional contracting qualification for lifting equipment installation engineering and the safety production license for construction enterprises issued by the construction administrative department.

The landing platform on each floor shall be flush with the structural plane as much as possible, the outer side shall be slightly higher than the inner side by mm,KiswaldaElectric basket elevatorWhy is it so popular and there shall be m high protective railings and mm high skirting boards on both sides. The platform board must be a wooden scaffold board not less than mm thick and laid tightly. It is not allowed to use bamboo boards and boards with different thickness. Local probe plates are not allowed on the side of the cage. Both sides of the landing platform frame are closed with dense mesh safety vertical net.


Vitti



Setting requirements: the anti-loose and anti-loose parts between the connecting pieces and the connecting pieces shall comply with the provisions of the operating instructions, and other objects shall not be used to replace them. For connecting bolts with pre-tightening requirements, torque wrenches or special tools shall be used to accurately tighten the bolts to the specified torque value according to the specified tightening sequence. When installing the connecting bolts of the standard section, the screw should be at the bottom and the nut should be at the top.

planvThe steel wire rope with cage distortion shall be scrapped immediately. Click here to download the construction technical data for free. Wire ropes with core or strand extrusion () or twist shall be scrapped immediately.

RIt is necessary to check the brake of the guide rail elevator frequently. There should be no dirt on the friction surface.

For customers to use and operate the lifting platform for a long time, Xiao Bian briefly introduces how to carry out the maintenance and repair of the lifting platform: First of all the maintenance of normal rules is mainly based on prevention, especially if it is found in time before damage or failure, it should be corrected or repaired. Careful inspection and maintenance at this time can save costs and avoid larger problems, and can also be selected according to customer requirements to meet customers ideal requirements.

eYThe safety distance between the outer edge of the upper part of the landing door and the moving parts of the electric elevator during normal operation shall not be less than .m; If the rated speed is not greater than .m/s,Electric elevator, electric elevator, electric lifting platform, electric hydraulic lifting platform - price manufacturer of electric elevator the safety distance can be .m.

The construction electric elevator shall perform the acceptance procedure, and the acceptance form shall be signed by the responsible person.


Copyright Notice:Electric elevator price manufacturerProvidedVitti sur SeineElectric brick elevator on construction siteQuality inspectionIt comes from the Internet and is only used for display purposes, and does not guarantee the accuracy, validity, timeliness or completeness of such information. The copyright of some pictures and text still belongs to the original author. If you infringe on your rights, please contact us and we will delete it within 24 hours as soon as possible. We only provide free services, relatedVitti sur SeineElectric brick elevator on construction siteQuality inspectionIt also does not indicate the views or opinions of this website, and has no reference value. Thank you.

    •   +86
    •   +1
    •   +355
    •   +213
    •   +93
    •   +54
    •   +971
    •   +297
    •   +968
    •   +994
    •   +247
    •   +20
    •   +251
    •   +353
    •   +372
    •   +376
    •   +244
    •   +1
    •   +1
    •   +43
    •   +61
    •   +853
    •   +1
    •   +675
    •   +1
    •   +92
    •   +595
    •   +970
    •   +973
    •   +507
    •   +55
    •   +375
    •   +1
    •   +359
    •   +1
    •   +389
    •   +229
    •   +32
    •   +354
    •   +1
    •   +48
    •   +387
    •   +591
    •   +501
    •   +267
    •   +975
    •   +226
    •   +257
    •   +850
    •   +240
    •   +45
    •   +49
    •   +670
    •   +228
    •   +1
    •   +1
    •   +7
    •   +593
    •   +291
    •   +33
    •   +298
    •   +689
    •   +594
    •   +590
    •   +39
    •   +63
    •   +679
    •   +358
    •   +238
    •   +500
    •   +220
    •   +242
    •   +243
    •   +57
    •   +506
    •   +1
    •   +299
    •   +995
    •   +53
    •   +590
    •   +1
    •   +592
    •   +7
    •   +509
    •   +82
    •   +31
    •   +599
    •   +1
    •   +382
    •   +504
    •   +686
    •   +253
    •   +996
    •   +224
    •   +245
    •   +1
    •   +233
    •   +241
    •   +855
    •   +420
    •   +263
    •   +237
    •   +974
    •   +1
    •   +269
    •   +383
    •   +225
    •   +965
    •   +385
    •   +254
    •   +682
    •   +599
    •   +371
    •   +266
    •   +856
    •   +961
    •   +370
    •   +231
    •   +218
    •   +423
    •   +262
    •   +352
    •   +250
    •   +40
    •   +261
    •   +960
    •   +356
    •   +265
    •   +60
    •   +223
    •   +692
    •   +596
    •   +230
    •   +222
    •   +1
    •   +1
    •   +976
    •   +1
    •   +880
    •   +51
    •   +691
    •   +95
    •   +373
    •   +212
    •   +377
    •   +258
    •   +52
    •   +264
    •   +27
    •   +211
    •   +674
    •   +505
    •   +977
    •   +227
    •   +234
    •   +683
    •   +47
    •   +672
    •   +680
    •   +351
    •   +81
    •   +46
    •   +41
    •   +503
    •   +685
    •   +381
    •   +232
    •   +221
    •   +357
    •   +248
    •   +966
    •   +590
    •   +239
    •   +290
    •   +1
    •   +1
    •   +378
    •   +508
    •   +1
    •   +94
    •   +421
    •   +386
    •   +268
    •   +249
    •   +597
    •   +677
    •   +252
    •   +992
    •   +886
    •   +66
    •   +255
    •   +676
    •   +1
    •   +1
    •   +216
    •   +688
    •   +90
    •   +993
    •   +690
    •   +681
    •   +678
    •   +502
    •   +58
    •   +673
    •   +256
    •   +380
    •   +598
    •   +998
    •   +34
    •   +30
    •   +852
    •   +65
    •   +687
    •   +64
    •   +36
    •   +963
    •   +1
    •   +374
    •   +967
    •   +964
    •   +98
    •   +972
    •   +39
    •   +91
    •   +62
    •   +44
    •   +1
    •   +246
    •   +962
    •   +84
    •   +260
    •   +235
    •   +350
    •   +56
    •   +236